Description
- . Material: Aleación de titanio
- Price: Reasonable Price
- Surface Treatment(Finishing):
- Manufacturing Service: OEM is available. EMD parts
- Tolerance: Can keep +/-0.005mm, high accuracy
- Specification: Products can be produced according to drawings customers offered
- Manufacturing Processes and Procedures: CNC milling, Wire-cut,grinding, bench work etc.
- Packing: Inner with the plastic bag and PE Foam, outer with carton. We can pack as per customer’s requirement.
Delivery
Flexible production lead time 7-20 days up to volume and drawings.
Transportation Arrangements
We are only 2-3 hours by road to the work’s seaport and Shenzhen Airport or Guangzhou Baiyun airport , Various transportation methods can be arranged according to our customer’s requirements.
Express Courier Services DHL, FedEx, UPS, TNT
4-5 days door to door to any destination in the world. Suitable for urgent prototypes or low to medium weight shipments.
Air Cargo Shipments
5-7 days, Daily flights from Shenzhen to all major destinations worldwide.
Sea Shipments
18-25 days to all major seaports in the world. Suitable for scheduled mass production delivery or large single shipments. We also book individual containers when necessary.
English
العربية
Français
Deutsch
Italiano
Português
Русский
Español


